Lokasi
Butir-butir
Tarikh Mula
Tarikh Tamat
Masa
Aktiviti
Muat Turun

Laluan SSP
Jalan Kuching
Continuation of night lane closures along Jalan Kuching & slip road opposite Sekolah Menengah Kebangsaan Dato' Ibrahim Yaacob.
20 October 2017
17 January 2018
10pm - 6am
To facilitate loading/unloading material, site clearing and tree cutting, piloting, utilities relocation, soil investigation, slip road realignment, bore piling works and any other related works to MRT Project.

Laluan SSP
Jalan Sultan Azlan Shah (near Kompleks Mutiara)
Continuation of night lane closures by stages along Jalan Sultan Azlan Shah (near Kompleks Mutiara).
20 October 2017
17 January 2018
10pm - 6am
To facilitate loading/unloading material, tree cutting, piloting, soil investigation, utilities relocation, drainage works, retaining wall, road curb demolition, road widening and box culvert works for MRT construction works.

Laluan SSP
Jalan Sultan Azlan Shah (near Pos Malaysia)
Continuation of night lane closures by stages along Jalan Sultan Azlan Shah (near Pos Malaysia).
20 October 2017
17 January 2018
10pm - 6am
To facilitate loading/unloading material, tree cutting, piloting, soil investigation, utilities relocation, drainage works, retaining wall, road curb demolition, road widening and box culvert works for MRT construction works.

Laluan SSP
Jalan Putra Permai (Puchong-bound)
Continuation of left most lane closure along Jalan Putra Permai (Puchong-bound).
18 October 2017
17 January 2018
24 hours
To facilitate site Mapping and Piloting, Soil Investigation, Survey, Utilities Relocation, Sheet Pile Installation, Bore Pile, Pile Cap, and any related works.

Laluan SSP
Jalan Putra Permai
Continuation of slip road closure along Jalan Putra Permai towards Giant Hypermarket.
18 October 2017
17 January 2018
24 hours daily
To facilitate site Mapping and Piloting, Soil Investigation, Survey, Utilities Relocation, Sheet Pile Installation, Bore Pile, Pile Cap, and any related works.

Laluan SSP
Jalan Kuala Selangor
Continuation of long-term one lane closure by stages for a stretch of 500 metres along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound).
15 October 2017
31 December 2017
10:00pm 6:00am; 10:00pm 10:00am
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, piloting and mapping, utilities relocation, temporary works (sheet pile and earth work), bore piling work, pile cap, and survey works for MRT construction.

Jalan-jalan alternatif

Tajuk
Kategori
Muat Turun

Laluan SBK
Alternative routes for Jalan Cheras road closures
General

Laluan SBK
Alternative routes for Jalan Semantan to Kota Damansara road closures
General

Laluan SBK
Alternative For Lebuhraya Damansara-Puchong (LDP), Jalan Damansara
General

Laluan SBK
ALTERNATE ROUTE JALAN DAMANSARA
General

Laluan SBK
ROADS DURING CONSTRUCTION- NORTHERN
General

Laluan SBK
ROADS DURING CONSTRUCTION- CITY CENTER
General


Export

Kembali ke Atas

 
Hak Cipta © 2017 Mass Rapid Transit Corporation Sdn Bhd(902884V). Semua Hak Terpelihara.