September
Laluan SSP13 September 2017
MRT SSP Line Project Construction Activities Along Jalan Desa (14 September 2017 – 29 November 2017)

Laluan SSP13 September 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (KL-bound and Kepong-bound)

Laluan SSP13 September 2017
Road Realignment and Right-Most Lane Closures Along Jalan Sultan Azlan Shah (KL-bound and Kepong-bound) (14 September 2017 – 14 September 2019)

Laluan SSP08 September 2017
MRT SSP Line Project Activities At Part Of Jalan Putra Permai and in front of Pasar Borong (11 September 2017 - 10 October 2018)

Laluan SSP08 September 2017
NIGHT LANE CLOSURES BY STAGES ALONG JALAN KEPONG (KL-BOUND) AND JALAN JAMBU GAJUS (08 September 2017 – 08 October 2017)

Laluan SSP08 September 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (KL-bound and Kepong-bound) (08 September 2017 – 21 October 2017)

Laluan SSP05 September 2017
MRT SSP Line Project Construction Activities Along Jalan Kuchai Lama (06 September 2017 – 25 Oct 2017)

Ogos
Laluan SSP29 Ogos 2017
MRT SSP Line Project - Continuation of Construction Activities At Jalan Cempaka (31 August 2017 - 22 November 2017)

Laluan SSP29 Ogos 2017
MRT SSP Line Project - Continuation of Construction Activities At Persiaran Dagang (31 August 2017 - 24 November 2017)

Laluan SSP29 Ogos 2017
MRT SSP Line Project - Continuation of Construction Activities At Damansara Damai & Long-Term Lane Closure Along Jalan PJU 10/10E & PJU 10/2A (09 September 2017 - 08 November 2017)

Laluan SSP22 Ogos 2017
Left-Most Lane Closure and Road Realignment along Persiaran Alpinia and Persiaran Sierra Utama (Towards Bandar 16 Sierra) 24 August 2017 - 28 February 2019

Laluan SSP22 Ogos 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (KL-bound) (23 August 2017 - 21 October 2017)

Laluan SSP22 Ogos 2017
MRT SSP Line Project Construction Activities Along Jalan Kampung Batu (KL-bound) (23 August 2017 – 29 August 2017)

Laluan SSP18 Ogos 2017
MRT SSP Line Project Activities at Part of Jalan Putra Permai (Serdang Bound) 21 August 2017 - 21 August 2017

Laluan SSP15 Ogos 2017
MRT SSP Line Project Construction Activities Along Jalan Jinjang Permai 2 (17 August 2017 – 28 August 2017)

Laluan SSP15 Ogos 2017
MRT SSP Line Project Construction Activities 16 August 2017 - 15 August 2018

Laluan SSP11 Ogos 2017
MRT SSP Line Project Construction Activities At Kampung Desa Aman (15 August 2017 – 15 February 2018)

Laluan SSP08 Ogos 2017
MRT SSP Line Project Construction Activities Along Jalan Jinjang Permai, Jalan Jinjang Permai 2, Jalan Jinjang Permai 3, Jalan Kepong (Kepong-bound) and Jalan Jambu Air Mawar (10 August 2017 - 17 October 2017)

Laluan SSP08 Ogos 2017
MRT SSP Line Project Construction Activities At Sekolah Menengah Kebangsaan (P) Jalan Ipoh (09 August 2017 – 30 September 2017)

Laluan SSP08 Ogos 2017
MRT SSP Line Project Construction Activities Along Jalan Tapah, Jalan Khalsa, Jalan Cumarasami, Jalan Vethavanam & Jalan St. Thomas (09 August 2017 – 09 December 2017)

Laluan SSP03 Ogos 2017
MRT SSP Line Project Construction Activities At Taman Million

Julai
Laluan SSP31 Julai 2017
MRT SSP Line Project Activities At Part Of Jalan Pinggiran 1/2 (ZEVA Residence) 02 August 2017 - 01 August 2018

Laluan SSP28 Julai 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (KL-bound) nearby Sekolah Kebangsaan Kampung Batu (01 August 2017 - 01 October 2017)

Laluan SSP28 Julai 2017
Long Term Lane Closure by Stages along Persiaran APEC 01 August 2017 - 31 October 2017

Laluan SSP27 Julai 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (KL-bound and Kepong-bound) (01 August 2017 - 01 November 2017)

Laluan SSP25 Julai 2017
MRT SSP Line Project Construction Activities nearby Sekolah Kebangsaan Salak Selatan

Laluan SSP25 Julai 2017
MRT SSP Line Project Construction Activities Along Jalan Kuchai Lama

Laluan SSP25 Julai 2017
MRT SSP Line Project Construction Activities at Jalan Pinggiran 1/3, Seri Kembangan

Laluan SSP14 Julai 2017
MRT SSP Line Project Construction Activities around Jalan Raya 1 16 July 2017 - 30 September 2017

Laluan SSP07 Julai 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (Kepongbound) (11 July 2017 – 11 July 2018)

Laluan SSP01 Julai 2017
MRT SSP Line Project Construction Activities 01 July 2017 - 30 September 2017

Laluan SSP01 Julai 2017
MRT SSP Line Project Construction Activities around Jalan Raya 6 01 July 2017 - 30 September 2017

Laluan SSP01 Julai 2017
MRT SSP Line Project Construction Activities around Jalan Raya 3 01 July 2017 - 30 September 2017

Jun
Laluan SSP29 Jun 2017
MRT SSP Line Project Construction Activities at Jalan 57, Taman Sri Ehsan, Kepong Sentral and Puncak Desa (05 July 2017 – 05 July 2018)

Laluan SSP23 Jun 2017
Long Term Lane Closure by Stages along Persiaran Alpinia and Persiaran Sierra Utama 01 July 2017 - 30 September 2017

Laluan SSP23 Jun 2017
MRT SSP Line Project Activities at Jalan Putra Permai Towards ZEVA Residence 28 June 2017 - 27 June 2018

Laluan SSP23 Jun 2017
MRT SSP Line Project Construction Activities around Jalan Utama 28 June 2017 - 30 September 2017

Laluan SSP23 Jun 2017
MRT SSP Line Project Construction Activities at Serdang Depot (06 July 2017 – 30 April 2018)

Laluan SSP23 Jun 2017
MRT SSP Line Project Construction Activities Along Besraya KM11 until KM12 (30 June 2017 – 29 June 2018)

Laluan SSP23 Jun 2017
MRT SSP Line Project Construction Activities at Kampung Baru Salak Selatan (30 June 2017 – 29 June 2018)

Laluan SSP22 Jun 2017
MRT SSP Line Project Construction Activities within the Vicinity of DOA and MARDI (23 June 2017 - 27 December 2017)

Laluan SSP22 Jun 2017
MEDIUM–TERM NIGHT LANE CLOSURE ON JALAN SULTAN AZLAN SHAH ( KL-BOUND), LORONG BALAM & JALAN PIPIT

Laluan SSP22 Jun 2017
MEDIUM-TERM PARTIAL LANE CLOSURES SURROUNDING JALAN SULTAN AZLAN SHAH

Laluan SSP20 Jun 2017
Penyambungan Aktiviti Projek Pembinaan Laluan MRT SSP di Jalan Sibu 1, Taman Wahyu 23 June 2017 - 23 September 2017

Laluan SSP20 Jun 2017
MRT SSP LINE PROJECT CONSTRUCTION ACTIVITIES AT JALAN CEMPAKA (21 JUNE 2017 - 25 AUGUST 2017)

Laluan SSP15 Jun 2017
MRT SSP Line Project Construction Activities along Jalan Sultan Azlan Shah (KL-Bound) 21 June 2017 - 22 August 2017

Laluan SSP13 Jun 2017
MRT SSP Line Project Construction Activities at Persiaran Dagang, Bandar Sri Damansara (13 June 2017 – 25 August 2017)

Laluan SSP13 Jun 2017
MRT SSP Line Project Construction Activities at Taman Fadason and Jinjang Utara Kepong (14 June 2017 - 16 December 2017)

Laluan SSP09 Jun 2017
MRT SSP Line Project Construction Activities at Jalan Merah Silu 12 June 2017 - 11 June 2018

Laluan SSP05 Jun 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (KL-bound & Kepong-bound) (07 June 2017 – 07 September 2017)

Laluan SSP01 Jun 2017
LONG-TERM ROAD REALIGNMENT ON JALAN SULTAN AZLAN SHAH (SEGAMBUT-BOUND) 1 JUNE 2017 - DEC 2021)

Mei
Laluan SSP31 Mei 2017
Continuation of MRT SSP Line Project Construction Activities At Putrajaya Sentral (01 June 2017 – 31 August 2017)

Laluan SSP30 Mei 2017
MEDIUM-TERM PARTIAL NIGHT LANE CLOSURES ON JALAN AMPANG AND JALAN BINJAI

Laluan SSP26 Mei 2017
MRT SSP Line Project Construction Activities Along Jalan Jinjang (29 May 2017-2 June 2017)

Laluan SSP22 Mei 2017
MRT SSP Line Project Construction Activities (Kampung Muhibbah to Sungai Besi)

Laluan SSP22 Mei 2017
MRT SSP Line Project Construction Activities (KL-Seremban Highway)

Laluan SSP22 Mei 2017
MRT SSP Line Project Construction Activities (Maju Development)

Laluan SSP18 Mei 2017
Construction Activities at Persiaran Alpinia, Persiaran Sierra Utama and Persiaran APEC

Laluan SSP18 Mei 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (KL-bound) nearby Sekolah Kebangsaan Kampung Batu

Laluan SSP18 Mei 2017
MRT SSP Line Project Construction Activities Along Jalan Jinjang (23 May 2017 – 28 May 2017)

Laluan SBK18 Mei 2017
MRT SSP Line Project Construction Activities at Taman Million (19 May 2017 – 04 August 2017)

Laluan SSP18 Mei 2017
MRT SSP Line Project Activities at Jalan Pinggiran 1/2 & Jalan Pinggiran 1/3, Jalan PP 31 and Jalan PP 40 (21 May 2017 – 20 May 2019)

Laluan SSP16 Mei 2017
MRT SSP Line Project Construction Activities at Taman Desa, Pekan Kepong and Jalan Besar Kepong

Laluan SSP16 Mei 2017
Aktiviti Projek Pembinaan Laluan MRT SSP di Pekan Lama Kepong

Laluan SBK11 Mei 2017
SHORT-TERM NIGHT LANE CLOSURES IN BUKIT BINTANG AREA

Laluan SSP11 Mei 2017
MRT SSP Line Project Construction Activities Along Jalan Jinjang Permai, Jalan Jinjang Permai 2, Jalan Jinjang Permai 3, Jalan Kepong (Kepong-bound), Jalan Jambu Air Mawar & Jalan Jambu Arang 1

Laluan SBK10 Mei 2017
PENUTUPAN JALAN JANGKA PENDEK WAKTU MALAM DI KAWASAN BUKIT BINTANG

Laluan SSP08 Mei 2017
MRT SSP Line Project Construction Activities Along Jalan Jinjang Permai 2 & Relocation of Parking Bays near Wisma TNB Kepong

Laluan SSP08 Mei 2017
MEDIUM-TERM ROAD REALIGNMENT ALONG JALAN CONLAY

Laluan SSP08 Mei 2017
PARTIAL NIGHT LANE CLOSURES ALONG JALAN SULTAN AZLAN SHAH (KL-BOUND)

Laluan SSP04 Mei 2017
Jalan Pinggiran Putra, Jalan Pinggiran 1/3 and 1/5

April
Laluan SSP20 April 2017
DEMOLITION WORKS WITHIN ESCAPE SHAFT 2 MRT CONSTRUCTION SITE (JALAN GURNEY)

Laluan SSP20 April 2017
SHORT-TERM NIGHT LANE CLOSURE ON JALAN BUKIT BINTANG & JALAN RAJA CHULAN

Laluan SSP20 April 2017
ONE-NIGHT LANE CLOSURE ON JALAN SULTAN AZLAN SHAH

Laluan SSP20 April 2017
SHORT-TERM PARTIAL NIGHT LANE CLOSURES ON PERSIARAN KLCC (JALAN BINJAI & JALAN LUMBA KUDA)

Laluan SSP13 April 2017
PENUTUPAN SEPARA LALUAN WAKTU MALAM DI JALAN KUANTAN & JALAN TUN RAZAK

Laluan SSP13 April 2017
MRT SSP Line Project Construction Activities Along Jalan Batu Kentonmen, Jalan Gopeng, Jalan Kangsar & Jalan 1/47B

Laluan SSP13 April 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (KL-bound & Kepong-bound)

Laluan SSP13 April 2017
MRT SSP Line Project Construction Activities Along Jalan Jinjang Permai 3 and Jalan Kepong (Kepong-Bound)

Laluan SSP13 April 2017
MRT SSP Line Project Construction Activities Along Jalan 1/18B (North-bound), nearby KTM Kampung Batu Station

Laluan SSP11 April 2017
ONE-NIGHT LANE CLOSURE ON JALAN GAGAK & JALAN SULTAN AZLAN SHAH

Laluan SSP11 April 2017
ONE-NIGHT PARTIAL NIGHT LANE CLOSURES ON JALAN KUANTAN & JALAN TUN RAZAK

Laluan SSP10 April 2017
MRT SSP Line Project Construction Activities at Kampung Muhibbah Area

Laluan SSP10 April 2017
MRT SSP Line Project Construction Activities at Taman Naga Emas Flat Area

Laluan SSP06 April 2017
SHORT-TERM PARTIAL ROAD CLOSURES ON A STRETCH OF JALAN TUN RAZAK & JALAN PAHANG BARAT

Laluan SSP06 April 2017
MEDIUM-TERM LANE CLOSURES SURROUNDING JALAN RAJA MUDA ABDUL AZIZ

Laluan SSP06 April 2017
LONG TERM LANE CLOSURE ON JALAN RAJA MUDA ABDUL AZIZ (CHOW KIT BOUND)

Mac
Laluan SSP30 Mac 2017
MRT SSP Line Project Construction Activities along Persiaran Parkview, Jalan Sultan Azlan Shah

Laluan SSP30 Mac 2017
MRT SSP Line Project Construction Activities at Giant Seri Kembangan & The Atmosphere

Laluan SSP30 Mac 2017
MRT SSP Line Project Construction Activities at Putrajaya Sentral

Laluan SSP28 Mac 2017
MRT SSP Line Project Construction Activities along Jalan Jinjang Permai, Jalan Jinjang Permai 2 and Jalan Kepong (Kepong-bound) & Jalan Jambu Air Mawar

Laluan SSP28 Mac 2017
MRT SSP Line Project Construction Activities along Jalan Sultan Azlan Shah (KL-Bound & Kepong-Bound)

Laluan SSP28 Mac 2017
MRT SSP Line Project Construction Activities at Jalan Putra Permai and Taman Mawar Jaya

Laluan SSP24 Mac 2017
SHORT-TERM NIGHT LANE CLOSURE ON JALAN SULTAN

Laluan SSP20 Mac 2017
MRT SSP Line Project Construction Activities at Persiaran Dagang, Bandar Sri Damansara

Laluan SSP16 Mac 2017
MEDIUM-TERM NIGHT LANE CLOSURES ON JALAN CHAN SOW LIN

Laluan SSP16 Mac 2017
MEDIUM-TERM LANE CLOSURES ON JALAN RAJA MUDA ABDUL AZIZ

Laluan SSP16 Mac 2017
MEDIUM-TERM LANE CLOSURES NEAR KAMPUNG PANDAN ROUNDABOUT

Laluan SSP10 Mac 2017
TWO-DAY LANE CLOSURE ON JALAN GAGAK OFF JALAN SULTAN AZLAN SHAH

Laluan SSP06 Mac 2017
PENUTUPAN LALUAN WAKTU MALAM DI JALAN RAJA MUDA ABDUL AZIZ

Laluan SSP06 Mac 2017
Aktiviti Projek Pembinaan Laluan MRT SSP di Jalan Sibu 1, Taman Wahyu

Laluan SSP03 Mac 2017
MRT SSP Line Project Construction Activities At KTM Kampung Batu

Laluan SSP03 Mac 2017
MRT SSP Line Project Construction Activities at Sekolah Menengah Kebangsaan (P) Jalan Ipoh

Laluan SSP03 Mac 2017
MRT SSP Line Project Construction Activities At Jalan Kepong (Kepong-bound and KL-bound)

Februari
Laluan SSP28 Februari 2017
EXTENSION OF NIGHT LANE CLOSURE IN JALAN BUKIT BINTANG

Laluan SSP28 Februari 2017
LONG-TERM PARTIAL LANE CLOSURES SURROUNDING JALAN SULTAN AZLAN SHAH.

Laluan SBK17 Februari 2017
PENUTUPAN JALAN JANGKA PENDEK DI JALAN BUKIT BINTANG

Laluan SSP14 Februari 2017
MEDIUM-TERM PARTIAL LANE CLOSURES SURROUNDING JALAN SULTAN AZLAN SHAH.

Laluan SSP10 Februari 2017
PENUTUPAN LORONG DI JALAN GAGAK “OFF” JALAN SULTAN AZLAN SHAH

Laluan SSP06 Februari 2017
MRT SSP Line Project - Continuation of Construction Activities and Inner Road Closure at Jalan Jati

Laluan SSP03 Februari 2017
PENUTUPAN LORONG DI JALAN GAGAK “OFF” JALAN SULTAN AZLAN SHAH

Laluan SBK03 Februari 2017
PENUTUPAN JALAN JANGKA PENDEK WAKTU MALAM DI JALAN BUKIT BINTANG & JALAN SULTAN ISMAIL

Laluan SSP03 Februari 2017
PENUTUPAN JALAN JANGKA PENDEK WAKTU MALAM DI KIA PENG

Januari
Laluan SSP31 Januari 2017
Continuation of Construction Activities at Damansara Damai & Long Term Lane Closure Along Jalan PJU10/10E and PJU10/2A

Laluan SSP31 Januari 2017
MRT SSP Line Project Construction Activities Along Jalan Sultan Azlan Shah (North-bound)

Laluan SBK25 Januari 2017
TWO-NIGHT LANE CLOSURE ON JALAN PANGGONG AND JALAN SULTAN

Laluan SSP23 Januari 2017
SHORT-TERM PARTIAL NIGHT LANE CLOSURES ON JALAN CHAN SOW LIN

Laluan SSP20 Januari 2017
MRT SSP Line Project Construction Activities at Persiaran Dagang, Bandar Sri Damansara

Laluan SSP18 Januari 2017
PENUTUPAN SEPARA LALUAN DI JALAN ABDUL MANAN NORDIN, KG. BARU

Laluan SBK18 Januari 2017
PENUTUPAN LALUAN WAKTU MALAM JANGKA MASA PENDEK DI JALAN BUKIT BINTANG

Laluan SSP13 Januari 2017
MRT SSP Line Project Construction Activities at at KTM Kampung Batu Station

Laluan SSP10 Januari 2017
Short-Term Night Lane Closures on Jalan Shelly & Jalan Peel, Cheras.

Laluan SSP10 Januari 2017
Short-Term Night Lane Closure on Jalan Tun Razak (Kg Pandan Roundabout)

Laluan SSP10 Januari 2017
Two-Night Lane Closures on Jalan Chan Sow Lin


Kembali ke Atas

 