SSP Line
Putrajaya
Lane closures along Lebuhraya Pintasan Dengkil FT29 (North-bound and South-bound).
24 February 2017
23 March 2017
7am - 7pm and 8pm - 6am daily
To facilitate mobilization of machineries, site clearing, soil investigation, piloting, road widening and pier construction for MRT Project.
SSP Line
Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound)
Continuation of lane closures along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound).
23 February 2017
22 March 2017
24 hours daily
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, mapping and piloting, utilities relocation, temporary works - sheet pile and earth work, soil investigation, road widening and diversion, piling and pile cap for MRT Construction Works.
SBK Line
Cheras Kajang Highway (Kuala Lumpur-bound)
Continuation of partial lane closure on the slip road from Taman Kota Cheras entering the Cheras Kajang Highway (Kuala Lumpur-bound, nearby Station Petronas Batu 9).

16 February 2017
28 February 2017
from between 10:00AM - 5:00PM and from between 10:00PM 5:00AM.
To facilitate maintenance works for Taman Sri Raya Link Bridge, reinstatement of street light and road resurfacing works
SBK Line
PGA Interchange (Kajang-bound and Kuala Lumpur Bound)
Continuation of partial lane closure at Exit 701 at the PGA Interchange (Kajang-bound and Kuala Lumpur Bound).
16 February 2017
28 February 2017
10:00AM 4:00PM and from 10:00 PM 5:00AM.
To facilitate pier painting works, reinstatement of street light and road resurfacing works.
SBK Line
Cheras Kajang Highway (Kuala Lumpur & Kajang-bound)
Continuation of closure motorcycle lane closure at Batu 9 & Batu 11 Tollbooth on the Cheras Kajang Highway (Kuala Lumpur & Kajang-bound).
16 February 2017
28 February 2017
9:00AM 5:00PM and from 10:00PM 5:00AM
To facilitate reinstatement of street lights, installation of guard rail, construction of road kerbs, landscape works and road resurfacing works at the motorcycle lane Bt 9 and BTHO MRT Station.
SBK Line
Cheras Kajang Highway (Kajang Bound)
Continuation of a one-lane closure at the Cheras Kajang Highway (Kajang Bound) from KM 10.6 until KM 11.6 for the stretch of one kilometer (from Cheras Hartamas entering Cheras Kajang Highway Kajang Bound until slip road entering FRU Batu 7, Cheras).
16 February 2017
28 February 2017
10:00AM until 5:00PM and 10:00PM until 5:00AM
To facilitate the reinstatement of street light, installation of guard rail, construction of road kerbs, landscape works and road resurfacing works.
SBK Line
Cheras Kajang Highway (Kajang-Bound)
Continuation of one-lane closure at Cheras Kajang Highway (Kajang-Bound.
16 February 2017
28 February 2017
10:00AM 5:00PM and 10:00PM - 5:00 AM
To facilitate the reinstatement of street lights, installation of guard rail, construction of road kerb , landscape works, construction of noise barrier and road resurfacing works.
SBK Line
Cheras Kajang Highway (Kajang-Bound)
Continuation of one-lane closure at Cheras Kajang Highway (Kajang-Bound.
16 February 2017
28 February 2017
10:00AM 5:00PM and 10:00PM - 5:00 AM
To facilitate the reinstatement of street lights, installation of guard rail, construction of road kerb , landscape works, construction of noise barrier and road resurfacing works.
SBK Line
Hulu Langat Interchange
Continuation of lane closure and a partial slip road closure at the Exit 702 Hulu Langat Interchange.
16 February 2017
28 February 2017
10:00PM - 5:00AM, intermittently.
To facilitate reinstatement works at Taman Suntex MRT Station.
SBK Line
Cheras-Kajang Highway
Continuation of slip road closures at Exit 702 and Exit 703 (Kajang-bound and Kuala Lumpur-bound), Cheras-Kajang Highway.
16 February 2017
28 February 2017
10:00PM 5:00AM
To facilitate the construction of Taman Suntex MRT Station and Sri Raya MRT Station and road resurfacing works.
SBK Line
Cheras-Kajang Highway
Continuation of lane closures at KM 14.0 until KM 15.0 on the Cheras-Kajang Highway.
16 February 2017
28 February 2017
Closure 1: 24 Hours Closure 2 & 3 : 10:00PM 5:00AM
To facilitate reinstatement of street lights, installation of guard rail, construction of kerb and road resurfacing works.
SBK Line
Jalan Bukit Bintang
Night lane closure along Jalan Bukit Bintang.
20 February 2017
27 February 2017 (excluding Friday and Saturday)
10:00pm-5:00am
Reinstatement of road and pedestrian walkway works
SBK Line
Kiara Interchange
Continuation of night closure will be implemented at Kiara Interchange.
15 February 2017
28 February 2017
11:00PM to 6:00AM
To facilitate installation of high limit signboard.
SBK Line
SPRINT Highway
Continuation of lane closure at SPRINT Highway after Petronas Station, Section 16 (KL-bound).
15 February 2017
28 February 2017
10:00PM to 6:00AM (Monday Friday) 12:00midnight to 6:00AM(Saturday Sunday)
To facilitate station maintenance works.
SBK Line
SPRINT Highway (Damansara Toll Plaza)
Continuation of the lane closure next to the SPRINT Highway (Damansara Toll Plaza).
15 February 2017
28 February 2017
10:00PM 6:00AM.
To facilitate station maintenance works.
SBK Line
SPRINT Highway and Jalan Ma'arof (KL and PJ-bound)
Continuation of night traffic management at SPRINT Highway and Jalan Ma'arof (KL and PJ-bound).
15 February 2017
28 February 2017
10:00PM to 6:00AM
To facilitate station maintenance works.
SBK Line
SPRINT Highway
Continuation of full night road closure of SPRINT flyover near Pusat Bandar Damansara (PJ-bound).
15 February 2017
28 February 2017
10:00PM to 6:00AM (Monday to Friday) and 12:00 midnight (Saturday) until 12:00 noon (Sunday)
To facilitate station maintenance works of the MRT Pusat Bandar Damansara Station.
SBK Line
Kiara Interchange to Wisma Lensa (KL and PJ-bound)
Continuation of the right-most lane closure from Kiara Interchange to Wisma Lensa (KL and PJ-bound).
15 February 2017
28 February 2017
10:00AM 4:00PM and 10:00PM 6:00AM
To facilitate landscaping and maintenance works.
SSP Line
Jalan Kuala Selangor (Kepong-bound)
Long-term lane closure from KTM Komuter Sungai Buloh until Caltex petrol station along Jalan Kuala Selangor (Kepong-bound).
15 February 2017
30 May 2017
10pm-6am; intermittently
To facilitate site clearing and tree cutting, mapping and piloting, utilities relocation and pipe jacking for MRT construction works.
SSP Line
Jalan Sultan Azlan Shah
Night partial lane closures along Jalan Sultan Azlan Shah, Jalan Selvadurai, Jalan Suppiah Pillay and Jalan Kasipillay.
15 February 2017
28 February 2017
10:00 pm - 5:00 am
Utilities relocation works.
SSP Line
Jalan Kepong
Continuation of Lane Closures Along Jalan Kepong (Sungai Buloh-Bound and Jinjang-Bound)
13 February 2017
13 April 2017
11pm 6am
To facilitate utility detection and relocation along Jalan Kepong for MRT construction works
SBK Line
Jalan Kuala Selangor (Sungai Buloh-bound)
Continuation of a long-term traffic management plan along Jalan Kuala Selangor (Sungai Buloh-bound).
10 February 2017
10 April 2017
10pm - 6am
To facilitate survey works, mapping and piloting and utilities relocation.
SSP Line
Persiaran Dagang
Continuation of Intermittent One Lane Closure Along Persiaran Dagang
8 February 2017
7 May 2017
8am 6pm; 10pm 6am
Reason To facilitate site clearing and tree cutting, installation of noise barrier, mapping and piloting, road widening and utilities relocation
SSP Line
Jalan Cempaka
Continuation of One Lane Closure Along Jalan Cempaka
8 February 2017
7 May 2017
24 hours
To facilitate site clearing and tree cutting, mapping and piloting, utilities relocation and pipe jacking
SSP Line
Persiaran Industri
Continuation of Lane Closures Along Persiaran Industri (Kepong-bound)
8 February 2017
26 March 2017
10pm - 6am; 24 hours
To facilitate site clearing and tree cutting, mapping and piloting, utilities relocation and pipe jacking for MRT construction works
SSP Line
Jalan Jinjang Permai 2
Continuation of Night Lane Closures by Stages Along Jalan Jinjang Permai 2 & Jalan Kepong (South-bound)
2 February 2017
2 May 2017
10pm 6am
To facilitate loading/unloading material and utilities relocation for MRT construction works.
SSP Line
Jalan Sultan Azlan Shah
Continuation of Night Lane Closures Along Jalan Sultan Azlan Shah - Near Kompleks Mutiara (North-bound and South-bound)
2 February 2017
2 May 2017
10pm 6am
To facilitate loading/unloading material, tree cutting, piloting, soil investigation, utilities relocation, drainage works, retaining wall, road curb demolition, road widening and box culvert works for MRT construction works.
SSP Line
Jalan Sultan Azlan Shah
Continuation of Night Lane Closures Along Jalan Sultan Azlan Shah - Near POS Malaysia (North-bound and South-bound)
2 February 2017
2 May 2017
10pm 6am
To facilitate loading/unloading material, tree cutting, piloting, soil investigation, utilities relocation, drainage works, retaining wall, road curb demolition, road widening and box culvert works for MRT construction works
SSP Line
Jalan Kuching
Continuation of night lane closures along Jalan Kuching & slip road opposite Sekolah Menengah Kebangsaan Dato' Ibrahim Yaacob.
27 January 2017
7 March 2017
10pm - 6am
To facilitate loading/unloading material, site clearing and tree cutting, piloting, utilities relocation, soil investigation and any other related works to MRT construction.
SBK Line
Jalan Kuala Selangor
Continuation of long-term night slip road closure to Jalan Kuala Selangor from Lebuhraya Damansara Puchong (LDP) from 19 January 2017 28 February 2017, 10:00PM-6:00AM daily.
19 January 2017
28 February 2017
10:00PM-6:00AM daily
To facilitate survey works, mapping and piloting and utilities relocation for MRT construction works.
SBK Line
Putrajaya
Long-term lane closures at Jalan P9 access road towards Putrajaya Sentral from 19 January 2017 30 April 2017, 9:00AM to 4:30PM and 6:00PM to 10:00PM.
19 January 2017
30 April 2017
9:00AM to 4:30PM and 6:00PM to 10:00PM.
To facilitate soil investigation, piloting and bore pile and other work related to MRT SSP Line.
SSP Line
Jalan Raja Muda Abdul Aziz
Long term road realignment along Jalan Raja Muda Abdul Aziz (between TH Selborn and Setia Sky Residence).
5 January 2017
30 September 2017
24 hours
Construction works for Kampung Baru MRT underground Station.
SSP Line
Persiaran Apec, Cyberjaya
Long-term lane closures along Persiaran Apec (North-bound and South-bound).
6 January 2017
30 April 2017
8am 7pm, intermittently.
Site clearing, piloting, soil investigation, relocation of utilities, landscape and road widening for MRT construction works.
SSP Line
Jalan Kepong
Long-term Slip Roads Closures at Metro Perdana and Laman Rimbunan (Jinjang-Bound)
01 December 2016
31 March 2017
24 hours
To facilitate piers construction for the MRT Project
SSP Line
JALAN KUALA SELANGOR (SUNGAI BULOH-BOUND AND KEPONG BOUND)
CONTINUATION OF LONG-TERM LANE CLOSURES ALONG JALAN KUALA SELANGOR (SUNGAI BULOH-BOUND AND KEPONG-BOUND)
25 November 2016
28 February 2017
10pm - 6am
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, mapping and piloting, utilities relocation, temporary works sheet pile and earth work, soil investigation, road widening and diversion, piling and pile cap for MRT construction works.
SSP Line
Jalan Kuala Selangor
Continuation of long-term one lane closure by stages for a stretch of 500 metres along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound).
18 November 2016
28 February 2017
10pm - 6am intermittently.
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, piloting and mapping, utilities relocation, temporary works (sheet pile and earth work), bore piling work, pile cap, and survey works.
SSP Line
Jalan Kuala Selangor
Permanent Edge of the Road Closure Along Damansara Damai Before Exit to Sungai Buloh Toll (Jalan Kuala Selangor)
14 September 2016
1 July 2021
24 Hours
To facilitate site clearing and tree cutting, mapping and piloting, loading/unloading material and open guard rail, utilities relocation, road widening on Jalan Kuala Selangor and construction of bridge to future Damansara Damai MRT station
SSP Line
Jalan Kuala Selangor
Permanent Edge of the Road Lane Closure Along Jalan Kuala Selangor (Sungai Buloh-Bound)
14 September 2016
1 July 2021
24 hours
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, mapping and piloting, utilities relocation, temporary works sheet pile and earth work, bore piling work and pile cap
SSP Line
Lebuhraya Damansara Puchong (LDP) and DUKE 2 Interchange (LDP-bound and Kepong-bound)
Slip road closure and traffic diversion at Lebuhraya Damansara Puchong (LDP) and DUKE 2
Interchange (LDP-bound and Kepong-bound).
26 August 2016
1 March 2017
24 hours daily
To facilitate traffic diversion, site clearing, mapping and piloting, road widening and utilities relocation.
SSP Line
Prima Damansara
Permanent Slip Road Closure Towards Prima Damansara
18 August 2016
1 July 2021
24 hours
MRT Pier Location
SBK Line
Persiaran Surian
Re-opening of Persiaran Mahogani Intersection near Sunway Giza Mall along Persiaran Surian
31 October 2015
-
-
Completion of MRT viaduct construction works
SBK Line
PERSIARAN SURIAN NEAR TROPICANA MEDICAL CENTRE (SUNGAI BULOH-BOUND)
UPDATED TIMING FOR NIGHT ROAD CLOSURE AT PERSIARAN SURIAN NEAR TROPICANA MEDICAL CENTRE (SUNGAI BULOH-BOUND)
15 June 2015
15 August 2015
10:00pm - 5:00am (fast lane, Sungai Buloh-bound) 10:00pm - 6:30am (slow lane, Sungai Buloh-bound) 10:00pm - 5:00am (LDP-bound)
To facilitate roof construction works for Kota Damansara station
SBK Line
JALAN DUTA - SEMANTAN
CONTINUATION OF FULL NIGHT CLOSURE FROM JALAN DUTA - SEMANTAN NEAR MENARA TSH (PJ-BOUND)
13 June 2015
16 July 2015
10:00pm to 5:00am (Mon - Fri) 12:00am (Sat) to 12:00pm (Sun)
To facilitate Segmental Box Girder (SBG) launching activities
SBK Line
CHANGKAT SEMANTAN
CONTINUATION OF FULL NIGHT CLOSURE AT SLIP ROAD OF CHANGKAT SEMANTAN (PJ-BOUND)
22 May 2015
31 May 2015
10:00pm to 6:00am
To install SBG and launching works
SBK Line
Jalan Damansara (in front of Muzium Negara)
Medium-term night lane closure on Jalan Damansara (KL bound), in front of Muzium Negara.
4 May 2015
28 May 2015
10:00pm to 5:00am
Lifting works at Muzium Negara MRT construction site.
SBK Line
Persiaran Surian (LDP-bound and Sungai Buloh-bound)
Continuation of the short-term night traffic diversion at Persiaran Surian (LDP-bound and Sungai Buloh-bound) near Tropicana Medical Center.
25 April 2015
31 July 2015
10:00pm - 5:00am
To facilitate construction works for Kota Damansara station.
SBK Line
Jalan Welfare
Permanent traffic alignment at Jalan Welfare.
8 April 2015
Until further notice
24-hours daily
To enable the construction of future permanent Entrance C structure MRT Kampung Selamat Station that located on the existing road alignment.
SBK Line
Jalan Saujana Impian
Closure of temporary U-turn at Jalan Saujana Impian (nearby Saujana Impian pedestrian bridge).
15 March 2015
Until further notice
12:00am
The closure is necessary as required from the local authorities, which is after the completion of the viaducts installation works at Saujana Impian Interchange.
SBK Line
Persiaran Surian (Sungai Buloh-bound)
Temporary one(1) night contra-flow at Persiaran Surian (Sungai Buloh-bound) from the junction of Jalan Camar (near Petronas/KFC) to the junction of Jalan Teknologi (near Petronas/Maybank).
8 August 2014
-
12midnight to 5am
To facilitate relocation of launching gantry.
SBK Line
Persiaran Surian (Kota Damansara-bound)
One-night road closure at Persiaran Surian at the stretch between the traffic light junction of Jalan PJU 3/31 to the traffic light junction of Jalan PJU 5/1 (Kota Damansara-bound).
17 July 2014
-
10pm to 6am
To facilitate MRT construction works along Persiaran Surian
SBK Line
Jalan Bukit Bintang, in front of Bangunan LTAT and Menara Worldwide (Jalan Tun Razak-bound)
Reopening of stretch of road
3 June 2014
-
24 hours
-
SBK Line
Jalan Bukit Bintang (between Menara Keck Seng and Starhill Gallery)
Postponement of traffic management plan
TBA
TBA
TBA
To facilitate underground construction work
SBK Line
Jalan Bukit Bintang and Jalan Raja Chulan
Temporary road closure at a stretch of Jalan Raja Chulan (Jalan Tun Razak-bound) between Jalan Conlay and Jalan Imbi.
30 May 2014
Until further notice.
24-hours daily
To facilitate ground treatment and road rectification works.
SBK Line
Jalan Bukit Bintang
The right turn from Jalan Raja Chulan into Jalan Imbi is now open to all traffic.
15 May 2014
-
-
-
SBK Line
Jalan Raja Chulan (Tun Razak-bound)
Jalan Raja Chulan is now open to all traffic heading towards Jalan Tun Razak. Two lanes in front of Chulan Square, which were closed since 7 May 2014, are now open. Road users can now gain access to Bangunan LTAT and Menara Worldwide from Jalan Raja Chulan.
13 May 2014
-
-
-
SBK Line
Ma'arof Interchange
Opening of U-turn and slip road at Ma'arof Interchange.
15 May 2014
-
8.00am
-
SBK Line
Jalan Bukit Bintang, Jalan Raja Chulan
A stretch of Jalan Raja Chulan (Tun Razak-bound) between Jalan Conlay and Jalan Imbi has been closed to all traffic. This is a continuation to the closure of a stretch of Jalan Bukit Bintang (Pavilion-bound) in front of the Audi Showroom.
6 May 2014
Until further notice.
24-hours daily
Road rectification works.
SBK Line
Jalan Sultan Ismail
Temporary night lane closure at Jalan Sultan Ismail, located in front of Lot 10 shopping mall.
2 May 2014
-
10:00pm to 5:00am
To facilitate road resurfacing work for the MRT Underground construction works.
SBK Line
Jalan Bukit Bintang (Jalan Tun Razak-bound)
Road closure at the stretch of Jalan Bukit Bintang (Jalan Tun Razak-bound) between Chulan Square and the Jalan Tun Razak intersection.
26 April 2014
Until further notice
24 hours daily
Road repair works
SBK Line
Jalan Bukit Bintang (Jalan Tun Razak-bound)
Immediate closure of Jalan Bukit Bintang between Chulan Square and Menara Worldwide (500m stretch).
23 April 2014
Until further notice
24 hours daily
Road repair works
SBK Line
SPRINT Highway (KL-bound)
The right-most and middle lanes at the Sprint Highway (KL-bound), between Bukit Kiara Interchange and the Jalan Setiapuspa junction will be realigned to the newly constructed lanes on the left.
16 April 2014
Until further notice
24-hours daily
To facilitate hacking work, boring, concreting, pile cap and pier construction works located at the median of the Sprint Highway, in preparation for the construction of MRT piers.
SBK Line
Jalan PJU 5/8 into Persiaran Surian
Motorists intending to exit from Jalan PJU 5/8 into Persiaran Surian will no longer be able to turn left at the junction of PJU 5/13. Motorists will be diverted to turn right at the PJU 5/13 junction, another right into Jalan PJU 5/9, and then into Jalan PJU 5/7 to join Persiaran Surian.
5 April 2014
Until further notice
24-hours daily
To facilitate MRT construction works.
SBK Line
Pedestrian walkway which starts from Sunway Nexis to Pelangi Square (LDP-bound)and between Pelangi Damansara to BU4 area (Dataran Sunway-bound).
Pedestrians using the walkway on either side of Persiaran Surian who wish to cross to the other side, may use the overhead pedestrian bridge at Pelangi Square/Pelangi Damansara. Zebra crossings will also be provided for this purpose.
Ongoing
Until further notice
24-hours daily
To facilitate the construction of MRT piers.
SBK Line
Sprint Highway/Jalan Semantan (PJ-bound)
There will be a one night closure of the Istana Pintu 2 ramp at Sprint Highway/Jalan Semantan (PJ-bound). A certain level of noise and vibration is expected during this period.
28 February 2014
-
10.00pm to 6:00am
To safeguard public safety during the removal of a signboard gantry, located near the Jalan Damansara Endah/Jalan Semantan junction.
SBK Line
In front of IPC, Persiaran Surian
Realignment of traffic lanes in front of IPC, Persiaran Surian
11 March 2014
-
24 hours
Construction of MRT piers
SBK Line
Sprint Highway between Jalan Setiapuspa & Wisma Lensa
Realignment of traffic at Sprint Highway between Jalan Setiapuspa and Wisma Lensa (KL-bound)
7 December 2013
-
24 hours
Pier construction works
SBK Line
Jalan Tun Mohd Fuad, Taman Tun Dr Ismail
Narrowing of a single lane at Jalan Tun Mohd Fuad, Taman Tun Dr Ismail for a stretch of 30 metres.
13 November 2013
Until further notice
24 hours
To facilitate preparation works for the construction of MRT piers and MRT Taman Tun Dr.Ismail Station.
SBK Line
SPRINT HIGHWAY, Jalan Setia Puspa
SPRINT Highway will undergo a full closure (KL-bound) from the exit of Jalan Setia Puspa towards the exit to Jalan Johar.
10 October 2013
Until further notice
12am to 5am
To facilitate the removal of gantry which is located between Victoria Station Restaurant and Wisma Lensa
SBK Line
Persiaran Surian
Closure of traffic light junction at Persiaran Surian into PJU 5/1.
9 October 2013
Until further notice
24 hours
To allow the construction of MRT piers at this stretch.
SBK Line
Jalan Damansara
The U-turn at Jalan Damansara into LDP will be permanently realigned (returning to Kuala Lumpur direction)

The U-turn which is currently located before the traffic light junction into LDP will be shifted to the traffic light junction.
13 July 2013
Until further notice
All day
To allow the construction of MRT piers
SBK Line
Jalan Damansara, Jalan Wan Kadir 3
Closure of traffic lights at the junction of Jalan Damansara & Jalan Wan Kadir 3.
23/05/2013
Until further notice
All day
SBK Line
Jalan Bukit Bintang
Partial closure of pedestrian crossing at Jalan Bukit Bintang, located between the Yayasan Selangor building and McDonald's restaurant.
15 May 2013
December 2016
All day
SBK Line
Jalan Bukit Bintang between intersection with Jalan Sultan Ismail and intersection with Jalan Bulan, Kuala Lumpur
Road Realignment
15 Oct 2012
Early 2014
All day
Construction work
SBK Line
Jalan Tong Shin off Jalan Bukit Bintang, Kuala Lumpur
Road Realignment
15 Sep 2012
End of 2015
All day
Construction work
SBK Line
Jalan Damansara in front of Muzium Negara, Kuala Lumpur
Road Realignment
22 Aug 2012
Sep 2014
All day
Construction work

Alternative Route

Alternative routes to avoid MRT construction

Description
Type
Download
Alternative routes for Jalan Cheras road closures
General
Alternative routes for Jalan Semantan to Kota Damansara road closures
General
Alternative For Lebuhraya Damansara-Puchong (LDP), Jalan Damansara
General
ALTERNATE ROUTE JALAN DAMANSARA
General
ROADS DURING CONSTRUCTION- NORTHERN
General
ROADS DURING CONSTRUCTION- CITY CENTER
General
ROADS DURING CONSTRUCTION- SOUTHERN
General
ALTERNATIVE ROUTES SG BULOH- CITY CENTRE (NORTHERN)
Area Wide
ALTERNATIVE ROUTES CITY CENTRE
Area Wide
ALTERNATIVE ROUTES CITY CENTRE- KAJANG (SOUTHERN)
Area Wide
ALTERNATIVE ROUTES BALAKONG - SG LONG- KAJANG
Sectional Alternative Routes
ALTERNATIVE ROUTES CHERAS-BALAKONG-SG LONG
Sectional Alternative Routes
ALTERNATIVE ROUTES CITY CENTRE-CHERAS
Sectional Alternative Routes
ALTERNATIVE ROUTES KOTA DAMANSARA- TTDI
Sectional Alternative Routes
ALTERNATIVE ROUTES MUTIARA DAMANSARA- PUSAT BANDAR DAMANSARA
Sectional Alternative Routes
ALTERNATIVE ROUTES SG BULOH- KOTA DAMANSARA
Sectional Alternative Routes
ALTERNATIVE ROUTES TTDI- CITY CENTRE
Sectional Alternative Routes


Top