Location
Description
Start Date
End Date
Time
Activity
Download

SSP Line
Jalan Kepong (Kepong, Sungai Buloh and Selayang-bound)
Continuation of lane closures along Jalan Kepong (Kepong-bound and Selayang-bound) and Jalan Kepong (Sungai Buloh-bound) below the Lebuhraya Selayang - Kepong (MRR2).
29 April 2017
27 July 2017
11pm to 6am (daily)
To facilitate utilities detection and relocation, RC wall construction works for MRT Project.

SBK Line
Jalan Panggong, Jalan Sultan and Jalan Tun H. S. Lee
Lane closures along Jalan Panggong, Jalan Sultan and Jalan Tun H. S. Lee.
28 April 2017
3 May 2017
11:00 pm 5:00 am (in stages)
To facilitate the reinstatement of road works for the Pasar Seni MRT station.

SSP Line
Jalan Tun Razak, Jalan Peel and Jalan Cheras.
Night road closures along Jalan Tun Razak, Jalan Peel and Jalan Cheras.
27 April 2017
6 July 2017
11:00 pm 5:00 am
To facilitate utilities relocation works for the MRT Sungai Buloh-Serdang-Putrajaya (SSP) Line.

SSP Line
Lebuhraya Pintasan Dengkil FT29 (North-bound and South-bound)
Continuation of lane closure along Lebuhraya Pintasan Dengkil FT29 (North-bound and South-bound).
24 April 2017
23 May 2017
7am - 7pm and 8pm - 6am daily
To facilitate mobilization of machineries, site clearing, soil investigation, piloting, road widening and pier construction for MRT Project.

SSP Line
Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound)
Continuation of lane closures along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound).
23 April 2017
22 May 2017
24 hours
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, mapping and piloting, utilities relocation, temporary works - sheet pile and earth work, soil investigation, road widening and diversion, piling and pile cap, 33kv TNB cable relocation for MRT Construction Works.

SSP Line
Persiaran APEC
Lane Closures Along Persiaran APEC (North-bound and South-bound) Cyberjaya
20 April 2017
31 May 2017
8am 5pm & 8am 1pm
To facilitate construction of free flow U-turn inclusive of site clearing, removal of existing road curb, installation of traffic management equipment and pavement works for MRT project

Alternative routes to avoid MRT construction

Description
Type
Download

SBK Line
Alternative routes for Jalan Cheras road closures
General

SBK Line
Alternative routes for Jalan Semantan to Kota Damansara road closures
General

SBK Line
Alternative For Lebuhraya Damansara-Puchong (LDP), Jalan Damansara
General

SBK Line
ALTERNATE ROUTE JALAN DAMANSARA
General

SBK Line
ROADS DURING CONSTRUCTION- NORTHERN
General

SBK Line
ROADS DURING CONSTRUCTION- CITY CENTER
General


Export

Back to Top

 
Copyright © 2017 Mass Rapid Transit Corporation Sdn Bhd.(902884V) All Rights Reserved.